
Self build
Self-Build Family Homes
A home designed around your plot, your brief and your budget.

New build and self build drawings, from the first plot appraisal to planning permission and approved Building Warrant drawings. We cover every town in North Lanarkshire.
Building your own home starts with the plot. We look at access, services, ground conditions, the neighbours and the council's planning policy before you commit, so you know what you can realistically build.
We then design the house around your brief and budget and take it through planning permission and the Building Warrant, coordinating the structural engineer and other specialists where needed.
Motherwell, Wishaw, Airdrie, Coatbridge, Cumbernauld, Bellshill and Kilsyth. We design extensions, loft conversions and alterations across North Lanarkshire.


Self build
A home designed around your plot, your brief and your budget.

Replacement
Replacing a tired house with a new one on the same plot.

Feasibility
Know what the council is likely to accept before you buy.

Timber frame
Drawings that work with your chosen timber frame supplier's design.

Annexes
Self-contained annexes for family members, designed to meet planning policy on ancillary accommodation.

Small sites
Two to four homes on a gap site or larger garden, with the planning case, layout and warrant drawings.
A new house always needs planning permission. Many people apply for planning permission in principle first, to test whether a house is acceptable on the plot, and then seek approval of the detailed design. The council assesses it against its Local Development Plan, including any policies on housing in the countryside. North Lanarkshire has 7 conservation areas: Blairhill and Dunbeth, Cumbernauld Village, Drumgelloch, Dullatur, Hamilton Road, Kilsyth, and Victoria and Town Centre. North Lanarkshire Council notes that most permitted development exemptions do not apply in conservation areas or to listed buildings, so extensions there usually need planning permission.
A new home needs a full Building Warrant covering structure, fire, energy, drainage and more. Since April 2024, the New Build Heat Standard means new homes in Scotland must use zero direct emissions heating, such as a heat pump, so heating is designed in from the start.
Householder applications go to North Lanarkshire Council's planning team and are assessed against the council's adopted Local Development Plan. Building Warrants go to the council's Building Standards team through Scotland's national online portal. A plot appraisal checks the site against that plan, the access, drainage and neighbouring homes before you commit to design fees.
Motherwell has Victorian and Edwardian villas and terraces in its older streets, large stocks of interwar and post-war semis, and newer developments around the town.
Wishaw has older stone homes near its centre, large areas of post-war housing and many newer family developments.
Airdrie has Victorian villas and traditional homes in its older streets, including the Drumgelloch conservation area, plus post-war semis and many newer developments. We also cover Chapelhall.
Coatbridge's Blairhill and Dunbeth conservation area has large Victorian villas, while the rest of the town has traditional terraces, post-war semis and newer estates.
Most of Cumbernauld dates from its new town years, in neighbourhoods such as Abronhill, Balloch, Condorrat and Westfield, alongside the historic Cumbernauld Village and Dullatur, both conservation areas. We also cover Condorrat and Dullatur.
Bellshill has traditional homes in its older streets, large areas of post-war semis and terraces, and newer family developments. We also cover Mossend and Viewpark.
Kilsyth's historic centre is a conservation area with traditional stone buildings, surrounded by post-war housing and newer homes with views to the hills.
Design usually takes two to four weeks. Where planning permission is needed, North Lanarkshire Council aims to decide within two months, and the Building Warrant typically takes two to four months.
Common questions about new builds in North Lanarkshire.
It establishes whether a house is acceptable on a site without approving the detailed design. It is a useful first step when buying a plot, and the detailed design is approved later.
Yes. A plot appraisal looks at access, services, ground conditions, neighbours and planning policy so you know the risks before you commit.
Not in a new home in Scotland under the New Build Heat Standard, which applies to Building Warrant applications made from April 2024. New homes need zero direct emissions heating, such as an air source heat pump.
Yes. Our design fees are fixed and agreed before any work starts, and are paid in stages as the project moves forward.
North Lanarkshire Council. We submit planning applications and Building Warrants as your agent and deal with the officers' questions.
North Lanarkshire has 7 conservation areas: Blairhill and Dunbeth, Cumbernauld Village, Drumgelloch, Dullatur, Hamilton Road, Kilsyth, and Victoria and Town Centre. Inside a conservation area more work needs planning permission, so we check your address first.
North Lanarkshire Council notes that most permitted development exemptions do not apply in conservation areas or to listed buildings, so extensions there usually need planning permission.
Related
Helpful guides
Once your drawings and Building Warrant are approved, our sister company Cutwood Joinery & Construction can build it for you.
Tell us about your home in North Lanarkshire and what you have in mind. We will call you back and arrange a free visit.
Prefer an instant conversation? Call 07700 144853.
Three simple steps from first message to design options for your home.
Prefer to talk? Call 07700 144853 or message us on WhatsApp
No obligation. Your design fees are fixed and agreed before any work starts.