New Build and Self Build Design in Ayrshire
Architectural design services

New Build and Self Build Design in Ayrshire

Self build and new home design across Ayrshire, Glasgow and Lanarkshire, from the first plot appraisal to approved Building Warrant drawings.

  • Free initial consultation
  • Fixed design fees
  • Concept to Building Warrant
New builds and self builds

Design Your Own Home From the Plot Up

Building your own home starts with the plot. We look at access, services, ground conditions, the neighbours and the council's planning policy before you commit, so you know what you can realistically build.

We then design the house around your brief and budget and take it through planning permission and the Building Warrant, coordinating the structural engineer and other specialists where needed.

New Builds design
Options

New Build Projects We Design

Self-Build Family Homes design

Self build

Self-Build Family Homes

A home designed around your plot, your brief and your budget.

Replacement Homes design

Replacement

Replacement Homes

Replacing a tired house with a new one on the same plot.

Plot Appraisals design

Feasibility

Plot Appraisals

Know what the council is likely to accept before you buy.

Timber Frame Homes design

Timber frame

Timber Frame Homes

Drawings that work with your chosen timber frame supplier's design.

Annexes and Granny Flats design

Annexes

Annexes and Granny Flats

Self-contained annexes for family members, designed to meet planning policy on ancillary accommodation.

Small Developments design

Small sites

Small Developments

Two to four homes on a gap site or larger garden, with the planning case, layout and warrant drawings.

Statutory approvals

New Builds Approvals in Scotland

Planning

Planning Permission

A new house always needs planning permission. Many people apply for planning permission in principle first, to test whether a house is acceptable on the plot, and then seek approval of the detailed design. The council assesses it against its Local Development Plan, including any policies on housing in the countryside.

Technical

Building Warrant

A new home needs a full Building Warrant covering structure, fire, energy, drainage and more. Since April 2024, the New Build Heat Standard means new homes in Scotland must use zero direct emissions heating, such as a heat pump, so heating is designed in from the start.

  • Structural engineer's design for foundations and frame
  • Energy and New Build Heat Standard compliance
  • Drainage and ventilation design
  • Fire safety and accessibility
One team from start to finish. We prepare and submit every application to your local council as your agent and answer the officers' questions until approval.
Project roadmap

How It Works

01

Site Visit & Your Brief

Typically week 1

We meet you at your home, talk through how you want to use the space and what you want to spend, and measure up the existing property so the design starts from accurate information.

You getHonest feasibility advice
We recordMeasured survey
Key milestoneBrief and budget agreed
02

Design Options & Indicative Costs

Typically weeks 2 to 4

Our design team works up layout options for your home. Alongside them you get a clear Project Scope and Pricing document showing our design fees, the council and engineer costs, and an indicative build cost band, so you know where you stand before committing.

You getLayout options
Cost clarityFees and build cost band
Key milestoneYour option chosen
03

Design Agreement & Detailed Drawings

Typically weeks 4 to 6

Once you're happy with the scope and figures, you sign a short design agreement. Your fees are fixed up front and paid in stages as the project moves forward, and we develop your chosen option into full plans and elevations.

You getFixed design fees
PaymentsIn stages, not all up front
Key milestoneDrawings ready to submit
04

Planning Permission (If Needed)

Typically around 2 months

Many extensions fall under permitted development and don't need planning permission. Where yours does, we submit the application to your local council, deal with the planning officer and can handle the council fees and portal on your behalf.

Statutory bodyLocal council planning
We handleApplication and council fees
Key milestonePlanning decision
05

Building Warrant & Structural Engineer

Typically 2 to 4 months

We produce the technical warrant drawings, coordinate the structural engineer's design and calculations, and submit your Building Warrant to the council's Building Standards team, answering their queries through to approval.

Statutory bodyCouncil Building Standards
We coordinateStructural engineer
Key milestoneBuilding Warrant approved
06

Ready To Build

Once your warrant is approved

Your approved drawings are ready for any builder to price accurately. When the work is finished, a Completion Certificate signs the project off.

You getDrawings ready to price
Key milestoneCompletion Certificate
Want it built?

Ready to Build Your New Build?

Once your drawings and Building Warrant are approved, our sister company Cutwood Joinery & Construction can build it for you.

Questions and answers

New Builds FAQs

Common questions about new builds in Scotland.

Do I need planning permission to build a house in Scotland?

Yes. Every new house needs planning permission. You can apply for planning permission in principle first to test the idea, then for approval of the detailed design.

What is planning permission in principle?

It establishes whether a house is acceptable on a site without approving the detailed design. It is a useful first step when buying a plot, and the detailed design is approved later.

Can you look at a plot before I buy it?

Yes. A plot appraisal looks at access, services, ground conditions, neighbours and planning policy so you know the risks before you commit.

Can I have a gas boiler in a new build?

Not in a new home in Scotland under the New Build Heat Standard, which applies to Building Warrant applications made from April 2024. New homes need zero direct emissions heating, such as an air source heat pump.

Do you work with timber frame companies?

Yes. We prepare planning and warrant drawings that work with your chosen timber frame supplier's design and coordinate the information between them and the structural engineer.

How long does a new build take to approve?

Planning permission for a new house can take two months or more depending on the site. The Building Warrant for a new home typically takes several months. We give you a realistic programme at the start.

Are your design fees fixed?

Yes. Our design fees are fixed and agreed before any work starts, and are paid in stages as the project moves forward.

Free consultation, no obligation

Start Your Project

Tell us about your home and what you have in mind. We will call you back and arrange a free visit.

  • Free feasibility review of your layout and planning potential
  • Fixed fee quotation with clear deliverables
  • Planning and Building Warrant applications handled for you

Prefer an instant conversation? Call 07700 144853.