New Build and Self Build Drawings South Ayrshire
South Ayrshire architectural design

New Build and Self Build Drawings South Ayrshire

New build and self build drawings, from the first plot appraisal to planning permission and approved Building Warrant drawings. We cover every town in South Ayrshire.

  • Free initial consultation
  • Fixed design fees
  • Concept to Building Warrant
New builds and self builds

New Builds Design in South Ayrshire

Building your own home starts with the plot. We look at access, services, ground conditions, the neighbours and the council's planning policy before you commit, so you know what you can realistically build.

We then design the house around your brief and budget and take it through planning permission and the Building Warrant, coordinating the structural engineer and other specialists where needed.

From Troon and Prestwick down through Ayr, Alloway and Doonfoot to Maybole and Girvan, we design home extensions and loft conversions across South Ayrshire.

New Builds in South Ayrshire
Options

New Build Projects We Design

Self-Build Family Homes design

Self build

Self-Build Family Homes

A home designed around your plot, your brief and your budget.

Replacement Homes design

Replacement

Replacement Homes

Replacing a tired house with a new one on the same plot.

Plot Appraisals design

Feasibility

Plot Appraisals

Know what the council is likely to accept before you buy.

Timber Frame Homes design

Timber frame

Timber Frame Homes

Drawings that work with your chosen timber frame supplier's design.

Annexes and Granny Flats design

Annexes

Annexes and Granny Flats

Self-contained annexes for family members, designed to meet planning policy on ancillary accommodation.

Small Developments design

Small sites

Small Developments

Two to four homes on a gap site or larger garden, with the planning case, layout and warrant drawings.

Statutory approvals

New Builds Approvals in South Ayrshire

Planning

Planning Permission

A new house always needs planning permission. Many people apply for planning permission in principle first, to test whether a house is acceptable on the plot, and then seek approval of the detailed design. The council assesses it against its Local Development Plan, including any policies on housing in the countryside. South Ayrshire has 23 conservation areas, including Alloway, Ayr Central, Ayr 2, Prestwick, Monkton, Troon, Southwoods, Maybole and Girvan. Most of South Ayrshire's conservation areas also have Article 4 Directions, which remove some permitted development rights. Work that would be permitted development elsewhere can need planning permission there, so we check this before design starts.

Technical

Building Warrant

A new home needs a full Building Warrant covering structure, fire, energy, drainage and more. Since April 2024, the New Build Heat Standard means new homes in Scotland must use zero direct emissions heating, such as a heat pump, so heating is designed in from the start.

  • Structural engineer's design for foundations and frame
  • Energy and New Build Heat Standard compliance
  • Drainage and ventilation design
  • Fire safety and accessibility
One team from start to finish. We prepare and submit every application to South Ayrshire Council as your agent and answer the officers' questions until approval.
Local knowledge

Building a New Home in South Ayrshire

Householder applications go to South Ayrshire Council's planning service and are assessed against the adopted South Ayrshire Local Development Plan (LDP2). The council is preparing a replacement plan (LDP3). Building Warrants go to the council's Building Standards team through Scotland's national online portal. A plot appraisal checks the site against that plan, the access, drainage and neighbouring homes before you commit to design fees.

Ayr

Ayr's housing ranges from red and blonde sandstone villas in the older parts of town, many in the Ayr Central and Ayr 2 conservation areas, through post-war family estates to newer timber-frame developments on the outskirts.

Alloway

Alloway is known for substantial villas and detached homes set in mature gardens, much of it within the Alloway conservation area, along with Burns Cottage and the Burns Monument area.

Doonfoot

Doonfoot is mainly detached and semi-detached homes and bungalows built from the 1960s onwards, many with good-sized gardens and some with sea views. We also cover Greenan.

Prestwick

Prestwick has a conservation area covering much of its older core, with villas and traditional houses near the seafront and town centre, surrounded by bungalows and family estates. We also cover Monkton.

Troon

Troon has substantial Victorian and Edwardian villas, many inside the Troon and Southwoods conservation areas, alongside bungalows, family estates and the homes of Barassie and Loans. We also cover Barassie and Loans.

Girvan

Girvan's town centre and harbour area are a conservation area with a management plan, full of traditional stone buildings.

Maybole

Maybole's historic centre is a conservation area with traditional stone buildings, and the town also has post-war housing and newer developments. We also cover Minishant and Kirkmichael.

Project roadmap

How a South Ayrshire Project Runs

Design usually takes two to four weeks. Where planning permission is needed, South Ayrshire Council aims to decide within two months, and the Building Warrant typically takes two to four months.

  1. 1Free first visitWe see your home, hear what you want and what you want to spend.
  2. 2Design optionsLayouts and an indicative cost band so you can decide with confidence.
  3. 3ApprovalsPlanning permission if needed, then the Building Warrant with the structural engineer.
  4. 4Ready to buildApproved drawings any builder can price accurately.
Questions and answers

New Builds FAQs for South Ayrshire

Common questions about new builds in South Ayrshire.

Do I need planning permission to build a house in South Ayrshire?

Yes. Every new house needs planning permission. You can apply for planning permission in principle first to test the idea, then for approval of the detailed design.

What is planning permission in principle?

It establishes whether a house is acceptable on a site without approving the detailed design. It is a useful first step when buying a plot, and the detailed design is approved later.

How long does a new build take to approve?

Planning permission for a new house can take two months or more depending on the site. The Building Warrant for a new home typically takes several months. We give you a realistic programme at the start.

Are your design fees fixed?

Yes. Our design fees are fixed and agreed before any work starts, and are paid in stages as the project moves forward.

Which council handles new builds applications in South Ayrshire?

South Ayrshire Council. We submit planning applications and Building Warrants as your agent and deal with the officers' questions.

Are there conservation areas in South Ayrshire?

South Ayrshire has 23 conservation areas, including Alloway, Ayr Central, Ayr 2, Prestwick, Monkton, Troon, Southwoods, Maybole and Girvan. Inside a conservation area more work needs planning permission, so we check your address first.

Is there an Article 4 Direction in South Ayrshire?

Most of South Ayrshire's conservation areas also have Article 4 Directions, which remove some permitted development rights. Work that would be permitted development elsewhere can need planning permission there, so we check this before design starts.

Related

Helpful guides

Want it built?

Ready to Build Your New Build?

Once your drawings and Building Warrant are approved, our sister company Cutwood Joinery & Construction can build it for you.

Free consultation, no obligation

Start Your New Build in South Ayrshire

Tell us about your home in South Ayrshire and what you have in mind. We will call you back and arrange a free visit.

  • Free feasibility review of your layout and planning potential
  • Fixed fee quotation with clear deliverables
  • Planning and Building Warrant applications handled for you

Prefer an instant conversation? Call 07700 144853.